+86-13532971605
Guangdong Yuanyao Test Equipment Co.,Ltd.
Guangdong Yuanyao Test Equipment Co.,Ltd.

Specification of the Operating Procedures of Mobile Thermal Shock Test Chamber

As the saying goes, Reasonable use of mobile thermal shock test chamber can avoid the performance of the damage itself; this article will then elaborate on the operating steps of the standard mobile thermal shock test box. The overall operation steps are divided into five major steps: pretreatment, initial inspection, test, recovery, inspection.


1. Pretreatment

Place the tested sample under normal atmospheric conditions until the temperature is stable.


2. Initial inspection

Compare the tested sample with the standard requirements, then put it directly into the thermal shock test chamber after meeting the requirements.


3. Test

(1) The test sample should be placed in the test box according to the standard requirements, and the temperature in the test box should be raised to the specified point, and kept for a certain period of time until the temperature of the test sample reaches a stable point, whichever subjects to the length of time.

(2) After the high temperature stage is over, transfer the test sample to a low temperature test chambe that has been adjusted to -55°C within 5 minutes, and keep it for 1 hour or until the temperature of the test sample reaches a stable point, whichever subjects to the length of time.

(3) After the low temperature stage is over, transfer the test sample to a high temperature test chamber that has been adjusted to 70°C within 5 minutes, and keep it for 1 hour or until the temperature of the test sample reaches a stable point, whichever subjects to the length of time.

(4) Repeat the above experimental method to complete three cycles. Depending on the size of the sample and the size of the space, the time may have a slight error.


4. Recovery

After the test sample is taken out of the test box, it should be restored under normal test atmospheric conditions until the test sample reaches a stable point.


5. Inspection

Compare the degree of damage in the standard and other methods to evaluate the test results.


The above are all the contents of the operation steps for the standardized use of the mobile thermal shock test chamber.

Resources